MTD 464 Betriebsanleitung Seite 442

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 493
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 441
ARMY TM 9-6115-464-34
AIR FORCE TO 35C2-3-445-2
NAVY NAVFAC P-8-624-34
5-21. LOAD BANK HOUSING.
a. Removal. Refer to the Operator and Unit Maintenance Manual for load bank housing removal
instructions.
b. Disassembly.
(1) Remove control box assembly (paragraph 5-20),
(2) Remove heater strips, thermostat and terminal board as outlined in the Operator and Unit
Maintenance Manual.
(3) Remove nut (1, figure 5-17), screw and captive washer assembly (2), and protective cap (3).
(4) Remove nut (4), screw and captive washer assembly (5), top load bank wiring harness (7).
(5) Remove split grommet (9), load bank wiring harness (6), and bottom load bank wiring harness (8)
from housing assembly (10).
c. Cleaning, lnspection, and
Repair.
(1) Clean housing in dry cleaning solvent (Federal Specification P-D-680) and dry with compressed air.
(2) Refer to the Operator and Unit Maintenance Manual for wiring harness cleaning, inspection, and
repair procedures.
(3) If the wiring harnesses have sustained damage and require repair or rebuild, refer to figures 5-18,
5-19, or 5-20 as required, for layout, identification of material requirements and Appendix A
references for detailed soldering and replacement procedures.
(4) Inspect housing assembly for cracks, breaks, warping and other damage. Replace housing assembly
if damaged beyond repair.
d. Assembly.
(1) Position housing assembly (10, figure 5-17), to install bottom load bank wiring harness (8), and
load bank wiring harness (6), with grommets (9).
(2) Install top load bank wiring harness (7), screw and captive washer assembly (5), and nut (4).
(3) Install protective cap (3), screw and captive washer assembly (2), and nut (1).
(4) Install heater strips, thermostat and terminal board as outlined in the Operator and Unit Maintenance
Manual.
(5) Install control box assembly (paragraph 5-20).
e. InstaIlation.
Refer to the Operator and Unit Maintenance Manual for load bank housing installation
instructions.
5-22. WIRING HARNESSES.
a. Refer to the Operator and Unit Maintenance Manual for wiring harness removal, cleaning, inspection, and
repair procedures.
b. If the wiring harness has sustained damage and requires repair or rebuild, refer to figure 5-21 or 5-22 for
layout, identification, and material requirements and Appendix A for detailed soldering and replacement
procedures.
c. Refer to the Operator and Unit Maintenance Manual for wiring harness installation instructions.
5-39
Seitenansicht 441
1 2 ... 437 438 439 440 441 442 443 444 445 446 447 ... 492 493

Kommentare zu diesen Handbüchern

Keine Kommentare