
$1.00OWNEirSGUM• ASSEMBLY • OPERATION • MAINTENANCE • PARTS •N5 H.R and 8 H.R VERTICAL LOG SPLITTERSModel Numbers 243-635-000 243-636-000IMPORTANT!Rec
NEUTRAL (Middle position)—Splitting wedge stops in place.REVERSE—Push the control handle upward for vertical operation, push it toward the rear for h
Hex BoltsMAINTENANCEAdjustment BoltsBack.PlateFIGURE 15.Periodically remove and replace the “gibs” (spacers) between the wedge plate and the back plat
Service air cleaner every 25 hours under normal conditions. Clean every few hours under extreme y dusty conditions. Poor engine performance and
\OFF-SEASON STORAGEIf the log splitter will not be used for a period longer than 30 days, the following steps should be taken to prepare the log split
HOW YOUR LOG SPLITTER OPERATESTHE PUMPA two-stage log splitter pump has one large aid one small gear section, using common inlet anc outlet por
HYDRAULIC TROUBLE SHOOTING GUIDEProblemProbable Cause(s)Corrective ActionCylinder rod will not moveA Broken driveshaft B Loose shaft coupling C Gear s
Models 635 and 6i\6NOTE: The engine is not under warranty by the iog spiitter manufacturer. . .If repairs or sen/ice is needed on the engine, piease c
Models 635 and 636\PARTS LIST FOR MODELS 635 AND 636 LOG SPLITTERSREF.NO.PARTNO.CODEDESCRIPTIONREF.NO.PARTNO.CODEDESCRIPTION1 712-0359Slotted Nut 3/4-
IMPORTANT INFORMATION FOR LOG SPLITTER USERSALWAYS:Use clean fluid and check fluid level regularly Use Dexron II Automatic Transmission Fluid oi 10W n
For Replacement Parts, Contact:SERVICE DEPARTMENT • P.O. BOX 368022 • CLEVELAND, OHIO 44136-9722
\IMPORTANTRULES FOR SAFE OPERATIONA.THIS SYMBOL POINTS OUT IMPORTANT SAFETY INSTRUCTIONS WHICH, IF NOT FOLLOWED, COULD ENDANGER THE PERSON AL SAFETY A
2. Know how to stop the unit and disengage the cont 'ols.3. Never place hands or feet between log and splitting wedge or between log
ASSEMBLY INSTRUCTIONS\Tools Required for Assembly(1) Soft Hammer or Mallet(2) 9/16" Wrenches*(2) 1/2" Wrenches*(1) 7/16" Wrench*(1) A
FIGURE 3.6. Place one flat washer just removed on each axle. Secure with hex slotted nut. Tighten slotted nut until snug, then back off approximate
*\Reservoir TankPumpSuctionHoseAHACHING THE WEDGE, BEAM AND CYLINDER ASSEMBLY1. Stand the wedge, beam and cyiinder assembly upright, with cylinder to
ReturnHoseFIGURE 10.FIGURE 11.Return Hose1. The return hose is attached to the top of the control valve. Loosen the hose clamp on the free end of th
f. Refill the reservoir to within 1-1/2" to 2" from the top of the tank. Much of the original fluid has been drawn into the cylinder an
Kommentare zu diesen Handbüchern